Friday, December 27, 2019

Construction for the week of December 30, weather permitting


Highway Division Update
  • Last week, the Highway Division repaired potholes on Clement Street, Corticelli Street, Crafts Avenue, Elizabeth Street, Elm Street, Locust Street, Market Street, Walnut Street, and the Armory Street parking lot.
  • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles.  As hazards arise and are identified, they will be addressed.
Roberts Meadow Watershed
  • A small timber harvest to remove dying red pines has resumed along the north side of Chesterfield Road east of Reservoir Road.
  • The logging will be conducted using horses and is being carried out by a licensed harvester.
  • This project began in Spring 2018 and is expected to be completed by January 2020.
Bridge Street, Damon Road, Interstate 91 - Exit 19
  • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Interstate 91 - Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
  • Upcoming work includes completing overhead utility transfers, paving the new I-91 northbound off ramp and the walking/bike path on Damon Road, guardrail installation, and installation of a precast, modular block wall adjacent to Route 9 westbound.
  • Questions about the project should be directed to MassDOT District 2.

An overview of all current Public Works projects can be found by going to Current Projects.


Friday, December 20, 2019

Construction for the week of December 23


Highway Division Update
  • Last week, the Highway Division focused efforts on snow operations and sanding throughout the City.  Potholes were repaired on Elm Street, Hatfield Street, King Street, Locust Street, Main Street, Nonotuck Street, Pine Street, and South Street.
  • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles.  As hazards arise and are identified, they will be addressed.
Roberts Meadow Watershed
  • A small timber harvest to remove dying red pines has resumed along the north side of Chesterfield Road east of Reservoir Road.
  • The logging will be conducted using horses and is being carried out by a licensed harvester.
  • This project began in Spring 2018 and is expected to be completed by January 2020.
Bridge Street, Damon Road, Interstate 91 - Exit 19
  • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Interstate 91 - Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
  • Upcoming work includes completing overhead utility transfers, paving the new I-91 northbound off ramp and the walking/bike path on Damon Road, guardrail installation, and installation of a precast, modular block wall adjacent to Route 9 westbound.
  • Questions about the project should be directed to MassDOT District 2.

An overview of all current Public Works projects can be found by going to Current Projects.


Friday, December 6, 2019

Construction for the week of December 9, 2019 Weather Permitting

Highway Division Update:

  • Last week, the Highway Division focused efforts on plowing and winter storm clean up. 
  • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles.  As hazards arise and are identified, they will be addressed.

Riverside Drive Speed Tables 

  • On Riverside Drive, two speed tables have been installed.  Signage and markings will be completed at a later date.
  • Roberts Meadow Watershed 
  • A small timber harvest to remove dying red pines will resume along the north side of Chesterfield Road east of Reservoir Road.
  • The logging will be conducted using horses and is being carried out by a licensed harvester.
  • This project began in Spring 2018 and is expected to be completed this fall.

Bridge Street, Damon Road, Interstate 91 - Exit 19 

  • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Interstate 91 - Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
  • Upcoming work includes completing overhead utility transfers, paving the new I-91 northbound off ramp and the walking/bike path on Damon Road, guardrail installation, and installation of a precast, modular block wall adjacent to Route 9 westbound.
  • Questions about the project should be directed to MassDOT District 2.

An overview of all current Public Works projects can be found by going to Current Projects.

Wednesday, November 27, 2019

Construction for the week of December 2, weather permitting


Highway Division Update
  • Last week, the Highway Division repaired:
    • Potholes on Chestnut Street, Dimock Street, and Locust Street.
    • Sidewalks on Main Street (Florence), Main Street (Northampton), North Maple Street, and Strong Avenue.
  • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
  • Street sweeping:
    • Is complete in Wards 1, 3, 4, 5, and 6.
    • Will continue next week in Ward 2.
Riverside Drive Speed Tables
  • On Riverside Drive, two speed tables have been installed. Signage and markings will be completed in the following weeks.
Roberts Meadow Watershed
  • A small timber harvest to remove dying red pines will resume along the north side of Chesterfield Road east of Reservoir Road.
  • The logging will be conducted using horses and is being carried out by a licensed harvester.
  • This project began in Spring 2018 and is expected to be completed this fall.
State Street
  • A new sewer manhole has been installed in front of 74 State Street.
  • Work is scheduled for Friday, November 29th. A police detail will be on site. If weather does not permit planned schedule, the work will be completed this week.
Bridge Street, Damon Road, Interstate 91 - Exit 19
  • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Interstate 91 - Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
  • Upcoming work includes completing overhead utility transfers, paving the new I-91 northbound off ramp and the walking/bike path on Damon Road, guardrail installation, and installation of a precast, modular block wall adjacent to Route 9 westbound.
  • Questions about the project should be directed to MassDOT District 2.

An overview of all current Public Works projects can be found by going to Current Projects.

Monday, November 25, 2019

Help Keep Our Sewers Working During the Holidays


Grease is a major cause of sewer clogs and back-ups
  • Keep all grease, oils, fats and fatty foods from going in the sink, garbage disposal, drains and sewers.
  • Dispose of grease, oils and fats by putting into a lidded container, mixing in absorbent material (such as kitty litter or coffee grounds), sealing the container and putting it in the trash.
For more information, please see What You Flush Matters (pdf)

Friday, November 22, 2019

Construction planned for the Week of November 25 Weather Permitting

Highway Division Update

  • Last week, the Highway Division repaired potholes on Fort Street, King Street, Country Way, Norwood Avenue and Allen Place.
  • Sidewalk repairs were completed on Gothic Street, Pearl Street and Strong Avenue.
  • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles.  As hazards arise and are identified, they will be addressed.
  • Street Sweeping is complete in Wards 1, 3, 4, 5, and 6. Work will continue in Ward 2 next week.
  • Sidewalk replacement project at the Academy of Music is complete.

Riverside Drive Speed Tables

  • On Riverside Drive, two speed tables have been installed.  Signage and markings will be completed in the following weeks.

Roberts Meadow Watershed

  • A small timber harvest to remove dying red pines will resume along the north side of Chesterfield Road east of Reservoir Road.
  • The logging will be conducted using horses and is being carried out by a licensed harvester.
  • This project began in Spring 2018 and is expected to be completed this fall.

State Street

  • A new sewer manhole has been installed in front of 74 State Street.
  • Work is scheduled for Friday, November 29th.  A police detail will be on site.

Bridge Street, Damon Road, Interstate 91 - Exit 19

  • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Interstate 91 - Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
  • Upcoming work includes completing overhead utility transfers, paving the new I-91 northbound off ramp and the walking/bike path on Damon Road, guardrail installation, and installation of a precast, modular block wall adjacent to Route 9 westbound.
  • Questions about the project should be directed to MassDOT District 2.

An overview of all current Public Works projects can be found by going to Current Projects.

Friday, November 15, 2019

Construction for the week of November 18 weather permitting

Highway Division Update 
  • Last week, the Highway Division repaired potholes on James Avenue, Terrace Lane, Elm Street, and West Street and downtown parking lots.
  • Sidewalks on Ryan Road and Pleasant Street were repaired.
  • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles.  As hazards arise and are identified, they will be addressed.
  • Street sweeping has been completed in Wards 1, 3, 4, 5, and 6.
  • Street sweeping has begun in Ward 2 and will continue next week.
  • The sidewalk replacement project at the Academy of Music is almost complete.  Final sealing is scheduled.
Burts Pit Road & Riverside Drive Paving Project 
  • The Burts Pit Road paving project is complete. 
  • On Riverside Drive, two speed tables have been installed.  Signage and markings will be completed in the following weeks.
Chesterfield Road, Spring Street, Main Street (Leeds) and Cross Street Paving Project 
  • The paving project is complete. 
Bridge Road, Brisson Drive and Glendale Road Paving Project 
  • The paving project is complete.
Roberts Meadow Watershed 
  • A small timber harvest to remove dying red pines will resume along the north side of Chesterfield Road east of Reservoir Road.
  • The logging will be conducted using horses and is being carried out by licensed harvester.
  • This project began in Spring 2018 and is expected to be completed this fall.
State Street
  • A new sewer manhole was installed in front of 74 State Street.  Additional work, including pavement patching and other site cleanup, will continue in the following weeks.
Bridge Street, Damon Road, Interstate 91 - Exit 19 
  • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Interstate 91 - Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
  • Upcoming work includes completing overhead utility transfers, paving the new I-91 northbound off ramp and the shared use path on Damon Road, guardrail installation, and installation of a precast, modular block wall adjacent to Route 9 westbound.  
  • Questions about the project should be directed to MassDOT District 2.
An overview of all current Public Works projects can be found by going to Current Projects.

Friday, November 8, 2019

Construction for the week of November 11 Weather Permitting


Highway Division Update
  • Last week, the Highway Division repaired:
    • Potholes on James Avenue, Terrace Lane, Elm Street, and West Street and downtown parking lots.
    • Sidewalks on Olander Drive and Pleasant Street.
  • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles.  As hazards arise and are identified, they will be addressed.
  • Street sweeping:
    • Has been completed in Wards 1, 3, 4, 5, and 6.
    • Has begun in Ward 2 and will continue next week.
  • Sidewalk replacement project at the Academy of Music is underway and will continue next week.
Burts Pit Road & Riverside Drive Paving Project
  • On Burts Pit Road, the paving project is substantially complete.  Minor work on curb and driveway repairs is planned.
  • On Riverside Drive, two speed tables have been installed.  Signage and markings will be completed in the following weeks.
Chesterfield Road, Spring Street, Main Street (Leeds) and Cross Street Paving Project
  • The paving project is substantially complete.  Minor work on driveways and shoulders is planned.  Removal of construction signs and tree protection will be completed in the following weeks.
Bridge Road, Brisson Drive and Glendale Road Paving Project
  • The paving project is complete.
Roberts Meadow Watershed
  • A small timber harvest to remove dying red pines will resume along the north side of Chesterfield Road east of Reservoir Road.
  • The logging will be conducted using horses and is being carried out by licensed harvester Tyler Sage.
  • This project began in Spring 2018 and is expected to be completed this fall.
State Street
  • A new sewer manhole was installed in front of 74 State Street.  Additional work, including pavement patching and other site cleanup, may be required this week.
Bridge Street, Damon Road, Interstate 91 - Exit 19
  • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Interstate 91 - Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
  • Upcoming work includes completing overhead utility transfers, paving the new I-91 northbound off ramp and the shared use path on Damon Road, guardrail installation, and installation of a precast, modular block wall adjacent to Route 9 westbound.  
  • Questions about the project should be directed to MassDOT District 2.

An overview of all current Public Works projects can be found by going to Current Projects.


Friday, November 1, 2019

Construction for the week of November 4 weather permitting

Highway Division Update

  • Last week, the Highway Division repaired sidewalks at Village Hill and on Summer Street.
  • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles.  As hazards arise and are identified, they will be addressed.
  • Street sweeping in Wards 1, 5, 6, and 4 is complete.
  • Street sweeping in Ward 3 has begun and will continue next week.
  • Sidewalk replacement project at the Academy of Music is underway.

Burts Pit Road & Riverside Drive Paving Project

  • On Burts Pit Road, the paving project is substantially complete.  Minor work on curb and driveway repairs is planned.
  • On Riverside Drive, two speed tables have been installed.  Signage and markings will be completed in the following weeks.
  • Chesterfield Road, Spring Street, Main Street (Leeds) and Cross Street Paving Project 
  • Final road paving is complete for the project.  Work continues on driveways and shoulders.

Bridge Road, Brisson Drive and Glendale Road Paving Project 

  • The Bridge Road and Glendale Road paving project is complete. 
  • Roberts Meadow Watershed 
  • A small timber harvest to remove dying red pines will resume along the north side of Chesterfield Road east of Reservoir Road.
  • The logging will be conducted using horses and is being carried out by licensed harvester Tyler Sage.
  • This project began in Spring 2018 and is expected to be completed this fall.


Bridge Street, Damon Road, Interstate 91 - Exit 19

  • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Interstate 91 - Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
  • Upcoming work includes completing overhead utility transfers, paving the new I-91 northbound off ramp and the shared use path on Damon Road, guardrail installation, and installation of a precast, modular block wall adjacent to Route 9 westbound.  
  • Questions about the project should be directed to MassDOT District 2.
State Street

  • A new sewer manhole will be installed in front of 74 State Street on Wednesday, November 6.  Police will be on duty and one lane of traffic will be maintained.


An overview of all current Public Works projects can be found by going to Current Projects.

Monday, October 28, 2019

Fair Street water service interruption, Wednesday, October 30

Water service on Fair Street will be unavailable on Wednesday, October 30 from 8 AM to 2 PM to accommodate hydrant repairs. All affected residents and/or businesses have been notified.

Friday, October 18, 2019

Construction work for the week of October 21 weather permitting

Highway Division Update
  • Last week, the Highway Division:
    • Repaired potholes on Hatfield Street and North Elm Street.
    • Repaired curbs on North Elm Street and Deerfield Drive.
  • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles.  As hazards arise and are identified, they will be addressed.
  • Street sweeping in Wards 1 and 6 is complete.
  • Street sweeping in Ward 5 will continue next week.
  • Sidewalk replacement project at the Academy of Music is underway.
Burts Pit Road & Riverside Drive Paving Project
  • On Burts Pit Road, the paving project is substantially complete.  Minor work on curb and driveway repairs is planned.
  • On Riverside Drive, two speed tables have been installed.  Signage and markings will be completed in the following weeks.
Chesterfield Road, Spring Street, Main Street (Leeds) and Cross Street Paving Project
  • Final road paving is complete for the project.  Work continues on driveways and shoulders.
Bridge Road, Brisson Drive and Glendale Road Paving Project
  • On Glendale Road and Bridge Road, work will include punch list items: loaming, seeding, removing tree protection, and other miscellaneous work.
Bridge Street, Damon Road, Interstate 91 - Exit 19
  • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Interstate 91 - Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
  • Preliminary work includes construction survey, work on the northbound I-91 off ramp and southbound I-91 on ramp, and utility relocations.
  • Questions about the project should be directed to MassDOT District 2.

An overview of all current Public Works projects can be found by going to Current Projects.

Friday, October 11, 2019

Construction for the week of October 14, 2019 weather permitting

Highway Division Update

Last week, the Highway Division:

  • Repaired potholes on Grandview. Street, Hatfield Street, North Elm Street, and Morningside Drive.
  • Pothole overlay was completed on Texas Road and Park Hill Road Ext.
  • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles.  As hazards arise and are identified, they will be addressed.
  • Curb work was done on Deerfield Drive, Pine Brook Curve, and Denise Court.
  • Street sweeping in Wards 1 and 6 is complete.
  • Street sweeping in Ward 5 will continue next week.

Burts Pit Road & Riverside Drive Paving Project

  • On Burts Pit Road, the paving project is substantially complete.  Minor work on curb and driveway repairs is planned.
  • On Riverside Drive, installation of speed tables is planned for Thursday, October 17th.  Detours will be in place.

Chesterfield Road, Spring Street, Main Street (Leeds) and Cross Street Paving Project

  • Final road paving is complete for the project.
  • Work continues on driveways and shoulders.

Bridge Road, Brisson Drive and Glendale Road Paving Project

  • The paving project is substantially complete.  No work is planned for this week.

Pavement Markings

  • The City has contracted with Hi-Way Safety Systems to repaint pavement markings across the City. The Contractor will be repainting speed hump and railroad markings.

Bridge Street, Damon Road, Interstate 91 - Exit 19 

  • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Interstate 91 - Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
  • Preliminary work includes construction survey, work on the northbound I-91 off ramp and southbound I-91 on ramp, and utility relocations.
  • Questions about the project should be directed to MassDOT District 2.

An overview of all current Public Works projects can be found by going to Current Projects.

Friday, October 4, 2019

Construction for the week of October 7, weather permitting

Highway Division Update
  • Last week, the Highway Division:
    • Repaired potholes on Trinity Row, Blackberry Lane and Berkshire Terrace.
    • Overlaid potholes on Fort Street, Hatfield Street, Park Hill Road, and Scanlon Avenue.
  • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles.  As hazards arise and are identified, they will be addressed.
  • Street sweeping in Wards 1 and 6 is complete.
  • Street sweeping in Ward 5 will continue next week.
Burts Pit Road Paving Project
  • The paving project is substantially complete.
  • The Contractor will work on installing guardrail and signs and repairing curbs and driveways during the following weeks.
  • Touch-ups to the loam and seed along the shoulder will be made at the end of the project.
Chesterfield Road, Spring Street, Main Street (Leeds) and Cross Street Paving Project
  • On Spring Street, Main Street (Leeds) and Cross Street:
  • Final paving is scheduled to take place on Tuesday, October 8th and Wednesday, October 9th, weather permitting.  Detours will be in place.  Expect heavy delays and seek alternate routes.
  • The Contractor will work on shoulders and sidewalks.
  • On Chesterfield Road, the Contractor will work on shoulders.
Bridge Road, Brisson Drive and Glendale Road Paving Project
  • On Glendale Road, the Contractor will work on loam and seed behind the curb.
  • On Bridge Road, the Contractor will remove tree protection.
Bridge Street, Damon Road, Interstate 91 - Exit 19
  • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Interstate 91 - Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
  • Preliminary work includes construction survey, work on the northbound I-91 off ramp and southbound I-91 on ramp, and utility relocations.
  • Questions about the project should be directed to MassDOT District 2.

An overview of all current Public Works projects can be found by going to Current Projects.

Monday, September 30, 2019

Chesterfield Road paving update 10-1-19


On Tuesday, October 1, from 7 AM until 5 PM, the City will be paving Chesterfield Road.  Chesterfield Road and Montague Road will be closed to through traffic. Only residents and emergency vehicles will have access.  Police officers will be present and emergency services have been notified.
For detour information please see the map provided.

Friday, September 27, 2019

Construction for the week of September 30, weather permitting



Highway Division Update
  • Last week, the Highway Division:
    • Repaired potholes on Overlook Drive, Woods Road and Fort Street.
    • Completed drain work on Fort Street, Olive Street and Arch Street.
    • Completed curb repair on O’Donnell Drive.
  • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
  • Street sweeping in Wards 1 and 6 is complete.
  • Street sweeping in Ward 5 will continue next week.
Burts Pit Road Paving Project
  • The paving project is substantially complete.
  • The Contractor will be working on guardrail, signs and curb repair during the following weeks.
  • Touch-ups to the loam and seed along the shoulder (roadway edge) will be made at the end of the project.
Chesterfield Road, Spring Street, Main Street (Leeds) and Cross Street Paving Project
  • On Spring Street, Main Street (Leeds) and Cross Street, the Contractor will continue work on sidewalk, curb, and loam.
  • On Chesterfield Road, the Contractor will adjust structures (manholes, catch basins).
Bridge Road, Brisson Drive, Denise Court and Glendale Road Paving Project
  • On Glendale Rd, the Contractor will work on line painting, driveway aprons, and loam behind the curb.
  • On Bridge Road, no work is anticipated this week.
Pavement Markings
  • The City has contracted with Hi-Way Safety Systems to repaint pavement markings across the City. This includes double yellow center lines, white edge lines, speed hump markings, arrows, railroad markings and crosswalks.
Bridge Street, Damon Road, Interstate 91 - Exit 19
  • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Interstate 91 - Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
  • Preliminary work includes construction survey, work on the northbound I-91 off ramp and southbound I-91 on ramp, and utility relocations.
  • Questions about the project should be directed to MassDOT District 2.

An overview of all current Public Works projects can be found by going to Current Projects.

Thursday, September 26, 2019

Fair Street water service 10/1/19


Water service on Fair Street will be unavailable on October 1st from 8AM to 2PM to accommodate hydrant repairs. All affected residents and/or businesses have been notified. "


Friday, September 20, 2019

Construction for the week of September 23 weather permitting

Highway Division Update
  • Last week, the Highway Division:
    • Repaired potholes on Harold Street, Cloverdale Street, Locust Street, Claire Avenue, Crescent Street and Woods Road.
    • Completed storm drain work on Fort Street, Olive Street and Arch Street.
  • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
  • Crosswalk painting will continue throughout the City next week. 
  • Street sweeping in Ward 1 has been completed and Ward 6 is almost complete.
  • Street sweeping in Ward 5 has begun and will continue next week.
Burts Pit Road Paving Project
  • The paving project is substantially complete.
  • The Contractor will be working on guardrail, signs and curb repair during the following weeks.
  • Touch-ups to the loam and seed along the shoulder (roadway edge) will be made at the end of the project.
Chesterfield Road, Spring Street, Main Street (Leeds) and Cross Street Paving Project
  • On Spring Street, Main Street (Leeds) and Cross Street, the Contractor will continue work on curb and loam installation.
  • On Chesterfield Road, paving is planned for Monday, September 23rd and Tuesday, September 24th, weather permitting. Detours will be in place with police officers to assist. No local traffic. Only residents and emergency vehicles will be allowed access. Please seek alternate routes.
  • Detour map (pdf)
  • On Chesterfield Road, after paving is complete, structures will be adjusted.
Bridge Road, Brisson Drive, Denise Court and Glendale Road Paving Project
  • Paving is scheduled for Glendale Road and Brisson Drive on Monday, September 23rd, weather permitting. Detours will be in place with police officers to assist.  Only residents and emergency vehicles will be allowed access.  Please seek alternate routes.
  • Detour map (pdf)
  • On Glendale Rd & Brisson Drive, after paving, no additional work is anticipated for the remainder of the week.
  • On Bridge Road, no work is anticipated this week.
  • On Denise Court, paving near Barrett Street is scheduled for Wednesday, September 25th.
South Main Street
  • The City has contracted with Eastern Pipe Service to clean and video select sanitary sewer mains.  The Contractor will be working on South Main Street in Florence, between Main St and Nonotuck Street, on Tuesday, September 25th.
Pavement Markings
  • The City has contracted with Hi-Way Safety Systems to repaint pavement markings across the City. This includes double yellow center lines, white edge lines, speed hump markings, arrows, railroad markings and crosswalks.
Bridge Street, Damon Road, Interstate 91 - Exit 19
  • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Interstate 91 - Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
  • Preliminary work includes construction survey, work on the northbound I-91 off ramp and southbound I-91 on ramp, and utility relocations.
  • Questions about the project should be directed to MassDOT District 2.
An overview of all current Public Works projects can be found by going to Current Projects.

Wednesday, September 18, 2019

Chesterfield Rd & Glendale Rd Paving, Sept 23 & 24


On Monday, September 23rd from 6:30 AM until 5 PM, the City will be paving Glendale Road. Glendale Road, Brisson Drive and Park Hill Road Extension will be closed to through traffic. Only residents and emergency vehicles will have access. Police officers will be present and emergency services have been notified.


Additionally, on Monday September 23rd & Tuesday September 24th, from 6:30 AM until 5 PM, the City will be paving Chesterfield Road. Chesterfield Road and Montague Road will be closed to through traffic. Only residents and emergency vehicles will have access. Police officers will be present and emergency services have been notified.


Friday, September 13, 2019

Construction for the week of September 16, weather permitting


Highway Division Update
  • Last week, the Highway Division:
    • Repaired potholes on Locust Street and Harold Street; and
    • Installed new curbing on Winter Street, Washington Place and Brookside Circle.
  • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
  • Street sweeping in Ward 1 has been completed and Ward 6 is almost complete.
  • Street sweeping in Ward 5 has begun and will continue next week.
Burts Pit Road Paving Project
  • The paving project is substantially complete.
  • The Contractor will be working on guardrail, signs and curb repair during the following weeks.
  • Touch-ups to the loam and seed along the shoulder (roadway edge) will be made at the end of the project.
Chesterfield Road, Spring Street, Main Street (Leeds) and Cross Street Paving Project
  • On Spring Street, Main Street (Leeds) and Cross Street, the Contractor will work on curb, loam and seed installation.
  • On Chesterfield Road, no work is planned for this week. Paving is planned for Monday, September 23rd and Tuesday, September 24th, weather permitting. Detours will be in place.
Bridge Road, Brisson Drive, Denise Court and Glendale Road Paving Project
  • On Bridge Road, the Contractor will continue installing loam adjacent to curbs.
  • On Glendale Road, the Contractor will work along the shoulder (roadway edge) and on installing curb, backfilling behind curb and relocating mail boxes. Paving is planned for Monday, September 23rd, weather permitting.
Pomeroy Terrace
  • Pomeroy Terrace will be closed on Monday, September 16th near the intersection of Bridge Street for sewer work by Saltmarsh Industries for a private developer. Please seek alternate routes.
Pavement Markings
  • The City has contracted with Hi-Way Safety Systems to repaint pavement markings across the City. This includes double yellow center lines, white edge lines, speed hump markings, arrows, railroad markings and crosswalks.
Clement Street Bridge
  • The City has contracted with NEL Corp to remove and replace the Clement Street bridge deck protective surfacing and to repave 30 feet at the deck approaches.
  • The Contractor plans to clean and install new surface on the bridge deck this week.
  • The bridge is expected to reopen by the end of September 2019.
Bridge Street, Damon Road, Interstate 91 - Exit 19
  • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Interstate 91 - Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
  • Preliminary work includes construction survey, work on the northbound I-91 off ramp and southbound I-91 on ramp, and utility relocations.
  • Questions about the project should be directed to MassDOT District 2.


An overview of all current Public Works projects can be found by going to Current Projects.

Friday, September 6, 2019

Construction for the week of September 9 - Weather permitting


Highway Division Update
  • Last week, the Highway Division repaired potholes on Crescent Street.
  • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
  • Last week, the Highway Division repaired catch basins on Masonic Street, Gothic Street and North Farms Road.
  • Last week, the Highway Division graded the following dirt roads: Walnut Trees Path, Webbs Hollow Road, Old Ferry Road, Riverbank Road and Rainbow Road.
  • Street sweeping in Ward 1 has been completed.
  • Street sweeping in Ward 6 has begun and will continue next week.
Burts Pit Road Paving Project
  • The paving project is substantially complete. 
  • The Contractor will be working on guardrail, signs & curb repair during the following weeks.
  • Touch-ups to the loam and seed along the shoulder (roadway edge) will be made at the end of the project.
Chesterfield Road, Spring Street, Main Street (Leeds) and Cross Street Paving Project
  • On Spring Street, Main Street (Leeds), and Cross Street, the Contractor will work on driveway aprons and curb installation.
  • On Chesterfield Road, no work is planned for this week.
Bridge Road, Brisson Drive, Denise Court and Glendale Road Paving Project
  • On Bridge Road, the Contractor will continue installing loam adjacent to curbs.
  • On Glendale Road, the Contractor will work along the shoulder (roadway edge).
Pavement Markings 
  • The City has contracted with Hi-Way Safety Systems to repaint pavement markings across the City. This includes double yellow center lines, white edge lines, speed hump markings, arrows, railroad markings, and crosswalks.
Clement Street Bridge
  • The City has contracted with NEL Corp to remove and replace the Clement Street bridge deck protective surfacing and to repave 30 feet at the deck approaches.
  • The bridge is expected to reopen by the end of September 2019.
Bridge Street, Damon Road, Interstate 91 - Exit 19
  • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Interstate 91 - Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
  • Preliminary work includes construction survey, work on the northbound I-91 off ramp and southbound I-91 on ramp, and utility relocations.
  • Questions about the project should be directed to MassDOT District 2.

An overview of all current Public Works projects can be found by going to Current Projects.

Friday, August 30, 2019

Construction for the week of September 2, 2019 Weather Permitting


Highway Division Update
  • Last week, the Highway Division repaired potholes on North Maple Street, Sterling Avenue, Hayward Road, East Center Street, Forbes Avenue, Chestnut Street, Brookwood Drive, Chestnut Avenue, Grove Avenue, Florence Street, and Hickory Drive.
  • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
  • Last week, the Highway Division repaired curb on Acrebrook Drive, Forbes Avenue and Clement Street.
  • Street sweeping in Ward 1 has been completed.
  • Street sweeping in Ward 6 has begun and will continue next week.
Burts Pit Road Paving Project
  • The paving project is substantially complete; no work is planned for the first week of September.
  • The Contractor will be working on punch list items (guardrail, signs & curb repair) during following weeks.
Chesterfield Road, Spring Street, Main Street (Leeds) and Cross Street Paving Project
  • On Spring Street, Main Street (Leeds), and Cross Street, the Contractor will work on driveway aprons and curb installation.
  • On Chesterfield Road, no work is planned for the first week of September.
Bridge Road, Brisson Drive, Denise Court and Glendale Road Paving Project
  • On Bridge Road, the Contractor will continue installing loam adjacent to curbs.
  • On Glendale Road, the Contractor will work on driveway aprons and curb installation.
  • On Brisson Drive, the Contractor plans to pave the roadway Tues, Sept 3rd, starting at 7:00 AM, weather permitting. Parking will be prohibited on Brisson Drive between 6:00 AM and 12:00 noon.
  • On Denise Court, the Contractor plans to excavate and grade a section of the roadway near Barrett Street. The Contractor will direct traffic around the work site.
Pavement Markings
  • The City has contracted with Hi-Way Safety Systems to repaint pavement markings across the City. This includes double yellow center lines, white edge lines, speed hump markings, arrows, railroad markings, and crosswalks.
Clement Street Bridge
  • The City has contracted with NEL Corp to remove and replace the Clement Street bridge deck protective surfacing and to repave 30 feet at the deck approaches.
  • The bridge is expected to reopen by the end of September 2019.
Bridge Street, Damon Road, Interstate 91 - Exit 19
  • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Interstate 91 - Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
  • Preliminary work includes construction signage installation, survey, work on the northbound I-91 off ramp and utility relocations.
  • Questions about the project should be directed to MassDOT District 2.


An overview of all current Public Works projects can be found by going to Current Projects.

Friday, August 23, 2019

Construction for the week of August 26, 2019 - Weather Permitting


Highway Division Update
  • Last week, the Highway Division repaired potholes on Oak Street and Fern Street in Florence.  They also repaired curbs on Acrebrook Drive, Drewson Drive, Austin Circle, Massasoit Street, Fourth Street, and Winter Street.
  • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
  • Street sweeping in Ward 1 has been completed.
  • Street sweeping in Ward 6 will continue next week.
An overview of all current Public Works projects can be found by going to Current Projects.

Burts Pit Road Paving Project
  • The paving project is substantially complete.
  • The Contractor will be working on guardrail installation and replacing select roadway signage.
Chesterfield Road, Spring Street, Main Street (Leeds), and Cross Street Paving Project
  • On Spring Street, Main Street (Leeds), and Cross Street, the Contractor will continue working on structure adjustments (manholes and catch basins) and will begin work on driveway aprons.
  • On Chesterfield Road, the Contractor will continue installing drainage improvements.
  • Delays may occur and residents are encouraged to seek alternative routes, when possible.
Bridge Road and Glendale Road Paving Project
  • On Bridge Road, the Contractor will continue work on driveway aprons and installing loam adjacent to curbs. 
  • On Glendale Road, the Contractor will be working on structure adjustments (manholes and catch basins) and may begin work on driveway aprons.
Pavement Markings
  • The City has contracted with Hi-Way Safety Systems to repaint pavement markings across the City. This includes double yellow center lines, white edge lines, speed hump markings, arrows, railroad markings, and crosswalks.
Clement Street Bridge
  • The City has contracted with NEL Corp to remove and replace the Clement Street bridge deck protective surfacing and to repave 30 feet at the deck approaches.
  • The bridge is expected to reopen by the end of September 2019.
Damon Road, Bridge Street, Exit 19
  • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June, 2021.
  • Preliminary work includes construction signage installation, survey, work on the northbound I-91 off ramp and utility relocations.
  • Questions about the project should be directed to MassDOT District 2.


Wednesday, August 21, 2019

Glendale Road Paving Scheduled for August 23

  • On Friday, August 23, 2019 from 6:30 AM to 5:00 PM, the first layer of pavement will be installed on Glendale Road from the Easthampton town line to 230 feet south of Westhampton Road (Route 66).
  • The roadway will be reduced to one lane for a distance of up to 2,000 feet (approximately 1/3 mile) during this operation.
  • Traffic controllers will alternate direction of travel by stopping one lane while allowing traffic to flow in the opposite lane. 
  • Travel away from the work site will be much faster than travel through the work site. 
  • Heavy delays are expected and commuters are encouraged to seek alternate routes. 
  • Delays are expected as the paving operation passes any entrance (driveway or street intersection) onto Glendale Road. 
  • Access will be provided for emergency vehicles. 
  • Construction signs will be in place, and police officers will be on duty to direct traffic. 
  • All residents and business owners on Glendale Road, Brisson Drive, and Park Hill Road Ext have received a Paving Notice (pdf)

An overview of all current Public Works projects can be found by going to Current Projects.




Friday, August 16, 2019

Construction work for the week of August 19, Weather permitting


Highway Division Update
  • Last week, the Highway Division repaired curbs on North Farms Road, Winter Street, Acrebrook Drive, Drewson Drive, and Warfield Place. 
  • To report a pothole, please submit a request for Pothole Repair.  The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
  • Street sweeping in Ward 1 has been completed.
  • Street sweeping in Ward 6 will begin next week.
An overview of all current Public Works projects can be found by going to Current Projects.
    Burts Pit Road Paving Project
    • Final pavement and top course on driveway aprons has been completed. 
    • Contractor will be working on crosswalk and line painting this week.
    Chesterfield Road, Spring Street, Main Street (Leeds), and Cross Street Paving Project
    • On Spring Street, Main Street (Leeds) and Cross Street the Contractor will be working on structure adjustments (manholes and catch basins) and driveway aprons.
    • On Chesterfield Road & Sylvester Road, the Contractor may start installing drainage improvements.
    Bridge Road and Glendale Road Paving Project
    • On Bridge Road, the Contractor will be installing pavement markings (i.e., line striping).
    • On Bridge Road, the Contractor will be installing new handicap ramps at JFK Middle School.
    • On Bridge Road, the Contractor will be installing loam adjacent to curbs on Friday, August 23rd. 
    • On Glendale Road, the Contractor will finish regrading of the roadway.
    • On Glendale Road, the Contractor will be installing the first layer of pavement on Friday, August 23rd.
    Roberts Meadow Watershed
    • Logging in the Reservoir Road area will begin.  Work will continue until late August.
    Pavement Markings
    • The City has contracted with Hi-Way Safety Systems to repaint pavement markings across the City. This includes double yellow center lines, white edge lines, speed hump markings, arrows, railroad markings, and crosswalks.
    Clement Street Bridge
    • Beginning Monday, July 22nd, the Clement Street Bridge will be CLOSED for deck resurfacing.
    • Bridge reopening anticipated in late September 2019.
    Damon Road, Bridge Street, Exit 19
    • Preliminary work includes construction signage installation, survey, work on the northbound I-91 off ramp and utility relocations.
    • Questions about the project should be directed to MassDOT District 2.

    Friday, August 9, 2019

    Construction work for the week of August 12, Weather permitting


    Highway Division Update
    • Last week, the Highway Division worked on Winter Street, repairing pavement, curbs and sidewalk.
    • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
    • Street sweeping in Ward 1 has been completed.
    • Street sweeping in Ward 6 will begin next week.

    An overview of all current Public Works projects can be found by going to Current Projects.

    Burts Pit Road Paving Project
    • Final pavement and top course on driveway aprons has been completed. 
    • Pavement markings (i.e., line striping) will be completed within the next 2 weeks after allowing time for the pavement to cure.
    Chesterfield Road, Spring Street, Main Street (Leeds), and Cross Street Paving Project
    • On Spring Street, Main Street (Leeds) and Cross Street the first course of pavement is complete.  The Contractor will be working on structure adjustments (manholes and catch basins).
    • On Chesterfield Road & Sylvester Road, the Contractor may begin laying out drainage improvements.
    Bridge Road and Glendale Road Paving Project
    • On Bridge Road, the Contractor will be paving driveway aprons on Wednesday, August 14th.
    • On Bridge Road, the Contractor will be installing pavement markings (i.e., line striping) on Thursday, August 15th and Friday, August 16th.
    • On Glendale Road, the Contractor will work on grading the roadway in preparation for laying the first pavement course.
    Roberts Meadow Watershed
    • Logging in the Reservoir Road area will begin.  Work will continue until late August.
    Pavement Markings
    • The City has contracted with Hi-Way Safety Systems to repaint pavement markings across the City. This includes double yellow center lines, white edge lines, speed hump markings, arrows, railroad markings, and crosswalks.
    Clement Street Bridge
    • Beginning Monday, July 22nd, the Clement Street Bridge will be CLOSED for approximately six weeks and detours will be in place.
    Damon Road, Bridge Street, Exit 19
    • Preliminary work includes construction signage installation, survey, work on the northbound I-91 off ramp and utility relocations.
    • Questions about the project should be directed to MassDOT District 2.

    Friday, August 2, 2019

    Construction work for the week of August 5, Weather permitting

    Highway Division Update
    • Last week, Public Works repaired potholes on North Main Street, Elm Street, Old Springfield Road, and Lovefield Street.
    • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
    • Street sweeping is in progress in Ward 1.
    An overview of all current projects can be found by going to Current Projects.

    Burts Pit Road Paving Project
    • Final pavement course has been completed. 
    • Top course on driveway aprons is scheduled for the week of August 5th.
    • Pavement markings (i.e., line striping) will be completed in 1-2 weeks to allow time for the pavement to cure. 
    Chesterfield Road, Spring Street, Main Street (Leeds), and Cross Street Paving Project
    • On Monday, August 5th, road reclamation will continue on Spring and Cross Streets. 
    • On Tuesday, August 6th starting at 7 AM, paving will begin on Spring Street, Main Street (Leeds), and Cross Street.  On Spring Street, the northbound lane will be paved from Pine Street to Meadow Street and Colonel LaValley Lane to Dimock Street.  On Main Street (Leeds), the northbound lane will be paved from Dimock Street to Cook's Dam Bridge.
    • On Wednesday, August 7th starting at 7 AM, paving will continue on Spring Street, Main Street (Leeds), and Cross Street.  On Spring Street, the southbound lane will be paved from Pine Street to Meadow Street and Colonel LaValley Lane to Dimock Street.  On Main Street (Leeds), the southbound lane will be paved from Dimock Street to Cook's Dam Bridge.
    • Cross Street paving is to begin in the afternoon of Tuesday, August 5th or Wednesday, August 6th, as time allows.
    • Detours around the work area will be in place as necessary.  Expect heavy delays and please seek alternate routes, when possible.  
    Bridge Road and Glendale Road Paving Project
    • On Bridge Road, the Contractor will be patching the pavement and placing asphalt curbing from Monday, August 5th to Wednesday, August 7th. 
    • On Thursday, August 8th, and Friday, August 9th, the Contractor will pave Bridge Road. Click here for more information.
    • On Glendale Road, the Contractor will work on grading the roadway and installing drainage improvements.
    Roberts Meadow Watershed
    • The City contracted with Goodnow Trucking of Winchester, NH for logging two white pine stands in Roberts Meadow Watershed. This project began in 2018 but was paused due to unfavorable ground conditions. Work will continue through early August.
    Pavement Markings
    • The City has contracted with Hi-Way Safety Systems to repaint pavement markings across the City. This includes double yellow center lines, white edge lines, speed hump markings, arrows, railroad markings, and crosswalks.
    Clement Street Bridge
    • Beginning Monday, July 22nd, the Clement Street Bridge has been CLOSED for approximately six weeks and detours will be in place.
    Damon Road, Bridge Street, Exit 19
    • Preliminary work includes construction signage installation, survey, work on the northbound I-91 off ramp and utility relocations.
    • Questions about the project should be directed to MassDOT District 2.

    Wednesday, July 31, 2019

    Bridge Road Paving Scheduled for August 8 & 9

    • Bridge Road paving will take place between Juniper Street and Hatfield Street on Thursday, August 8, 2019 and Friday, August 9, 2019 from 6 AM to 6 PM.
    • One lane will be paved each day.
    • Traffic will be allowed to travel only in the eastbound direction.  Westbound traffic will be detoured at Hatfield Street to Route 9. Please see the Detour Map (pdf) for more details.
    • Heavy delays are expected and commuters are encouraged to seek alternate routes.  The longest delays will occur as the paving operation passes any entrance (driveway or street intersection) onto Bridge Road.  It may take an hour for the pavement to set.
    • Access will be provided for emergency vehicles.  Detours will be in place and police officers will be on duty to direct traffic.  
    • In the event of rain or other delay, paving on Bridge Road may be continued to Monday, August 12, 2019.
    • All residents and business owners on Bridge Road between the roundabout and Hatfield Street have received a Paving Notice (pdf).

    Friday, July 26, 2019

    Construction for the week of July 28

    Highway Division Update
    • Last week, Public Works repaired potholes on Riverside Drive and Westwood Terrace.
    • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
    • Street sweeping is in progress in Ward 1.

    An overview of all current projects can be found by going to Current Projects.


    Burts Pit Road Paving Project
    • Final pavement course has been completed. 
    • Top course on driveway aprons is scheduled for the week of August 29.
    • Pavement markings (i.e. line striping) will be completed in 2-3 weeks to allow time for the pavement to cure. 
    Chesterfield Road, Spring Street, Main Street (Leeds), and Cross Street Paving Project
    • Main Street - Leeds, Spring Street, and Cross Street: Road reclamation is expected to begin on Wednesday (July 31st). It is to continue Thursday and Friday (August 1st and 2nd) and also the following Monday (August 5th). During this time period, work is anticipated to begin on Main Street - Leeds moving south onto and through Spring Street, then will move to Cross Street.
    • There will be delays in traffic and alternate routes are suggested, when possible.
    Bridge Road and Glendale Road Paving Project
    • On Bridge Road, the Contractor will be patching the pavement. 
    • On Glendale Road, the Contractor will continue installing drainage improvements.
    Flood Control System Maintenance Project
    • The City has contracted with Northern Tree Service to perform vegetation removal and maintenance work on portions of the flood control system.
    • Minor work to complete the project will be ongoing throughout the month of July.
    Roberts Meadow Watershed
    • The City contracted with Goodnow Trucking of Winchester, NH for logging two white pine stands in Roberts Meadow. This project began in 2018 but was paused due to unfavorable ground conditions. Work will continue through early August.
    Damon Road, Bridge Street, Exit 19
    • Preliminary work includes construction signage installation, survey, work on the northbound I-91 off ramp and utility relocations.
    • Questions about the project should be directed to MassDOT District 2.
    Baker Hill Road
    • The Department of Public Works will be reconstructing a portion of Baker Hill Road, in the vicinity of #36-65. This work includes excavation and pavement.
    • Expect minor delays during this construction.
    Clement Street Bridge
    • Beginning Monday, July 22, the Clement Street Bridge will be CLOSED for approximately six weeks and detours will be in place.
    Pavement Markings
    • The City has contracted with Hi-Way Safety Systems to repaint pavement markings across the City. This includes double yellow center lines, white edge lines, speed hump markings, arrows, railroad markings, and crosswalks.

    Tuesday, July 23, 2019

    Burts Pit Road Paving


    Burts Pit Road paving will begin Wednesday, July 24 at 7 AM, in the eastbound lane from Forest Glen Drive to Clement Street.  On Thursday, July 25 at 8 AM, paving will be conducted in the westbound lane from Clement Street to Forest Glen Drive. Clement Street will be inaccessible on July 25 between the hours of 8 AM and 10 AM to protect the integrity of the new pavement.  Emergency access will be maintained.  For all other Burts Pit Road residents, to avoid damaging the new asphalt, please wait for instructions from crews on duty for access. 
    Detours around the work area will be in place where possible.  Expect heavy delays.

    Friday, July 19, 2019

    Construction work for the week of July 22 Weather Permitting

    Highway Division Update
    • Last week, Public Works repaired potholes on Nonotuck Street, Industrial Drive, Atwood Drive, Prospect Street, Elm Street, Butler Place, Hawley Street, Riverside Drive, and Old Springfield Road.
    • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
    • Street sweeping is in progress in Ward 1.
    Burts Pit Road Paving Project
    • The City has contracted with Palmer Paving for paving and roadway improvements on Burts Pit Road (Clement Street to Forest Glen Road). 
    • Final pavement course is scheduled for July 24, 25 and 26, subject to weather conditions. Access to driveways may be limited for a period of up to one hour following the placement of pavement. Coordination for access can be made with police details, DPW staff, and/or construction crews on-site.
    • Traffic will be limited to one lane during paving.
    Chesterfield Road, Spring Street, Main Street (Leeds), and Cross Street Paving Project
    • The City has contracted with Palmer Paving for paving and roadway improvements on Chesterfield Road (Westhampton town line to Kennedy Road), Spring Street (Dimock Street to Col. Lavalley Lane; Meadow Street to Pine Street), Main Street - Leeds (Spring Street to 535 feet northerly at the Mill River bridge), and Cross Street (Florence Road to Bliss Street). The scope of this project includes pavement reclamation, cold in-place recycling, line painting, and drainage improvements. 
    • On Cross Street, drainage installation is ongoing and is to continue through the week.
    • On Spring Street, structures are to be lowered throughout the week.
    • Mobilization and drainage install is anticipated to begin toward end of the week for Chesterfield Road.
    Bridge Road and Glendale Road Paving Project
    • The City has contracted with Warner Bros for paving on Bridge Road from 100 feet west of Juniper Street to Hatfield Street and Glendale Road from 230 feet south of Westhampton Road to the Easthampton Town line. The overall schedule is May 13 to August 21. Emergency vehicle access and one-way traffic will be maintained. There will be traffic delays. Please seek alternate routes if possible.
    • On Bridge Road, the Contractor will install asphalt curb and scored concrete islands.
    • On Glendale Road, the Contractor will install drainage improvements.
    Flood Control System Maintenance Project
    • The City has contracted with Northern Tree Service to perform vegetation removal and maintenance work on portions of the flood control system.
    • Minor work to complete the project will be ongoing throughout the month of July.
    Roberts Meadow Watershed
    • The City contracted with Goodnow Trucking of Winchester, NH for the sale of timber in two white pine stands in Roberts Meadow. This logging operation began in 2018, but was paused due to ground conditions. This project continue through early August.
    Damon Road, Bridge Street, Exit 19
    • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June, 2021.
    • Preliminary work includes construction signage installation, survey, work on the northbound I-91 off ramp and utility relocations.
    • Questions about the project should be directed to MassDOT District 2.
    Baker Hill Road
    • The Department of Public Works will be reconstructing a portion of Baker Hill Road this week, in the vicinity of #36-65. This work includes excavation and pavement.
    • Expect minor delays during this construction.
    Clement Street Bridge
    • The City has contracted with NEL Corp to remove and replace the Clement Street bridge deck protective surfacing and repave 30 feet at the deck approaches.
    • Beginning Monday, July 22, the Clement Street Bridge will be CLOSED for approximately six weeks and detours will be in place.
    Pavement Markings 
    • The City has contracted with Hi-Way Safety Systems to repaint pavement markings across the City. This includes double yellow center lines, white edge lines, speed hump markings, arrows, railroad markings, and crosswalks.


    Wednesday, July 17, 2019

    Water Main Break on Bridge Road, Service Interrupted and Road Closed


    There is a water main break on Bridge Road in the vicinity of 580 Bridge Road. Repair work is currently underway. Water service on Bridge Road from Hatfield Street to Chestnut Street will be interrupted until 2:30pm. Bridge Road is closed from Hatfield Street to Chestnut Street. Emergency services have been notified. Police are on-site.

    Update for Chesterfield Road, Spring Street, Main Street (Leeds), and Cross Street Paving Project

    Chesterfield Road, Spring Street, Main Street (Leeds), and Cross Street Paving Project


    • The City has contracted with Palmer Paving for paving and roadway improvements on Chesterfield Road (Westhampton town line to Kennedy Road), Spring Street (Dimock Street to Col. Lavalley Lane; Meadow Street to Pine Street), Main Street - Leeds (Spring Street to 535 feet northerly at the Mill River bridge), and Cross Street (Florence Road to Bliss Street). The scope of this project includes pavement reclamation, cold in-place recycling, line painting, and drainage improvements.  
    • On Spring Street, drainage installation is ongoing this week.
    • On Cross Street, drainage installation is to begin on Thursday and is to continue through the week.

    Friday, July 12, 2019

    Construction for the Week of July 15 weather permitting

    Highway Division Update
    • Last week, Public Works repaired potholes on Barrett Street, Round Hill Road, Federal Street, Elm Street, and Dennison Place.
    • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
    • Street sweeping was started in Ward 1 and will continue next week.
    Burts Pit Road Paving Project
    • The City has contracted with Palmer Paving for paving and roadway improvements on Burts Pit Road (Clement Street to Forest Glen Road). Through traffic may be limited to one lane during certain phases of the project; expect delays. 
    • The first course of pavement, structure adjustments and berm have been completed. Loam and seed behind the berm is underway and will be completed the week of July 15. 
    • Final pavement course is scheduled for July 24, 25 and 26, subject to weather conditions. 
    • Traffic may be limited to one lane or closed to through traffic, allowing local traffic and emergency vehicles only for certain segments
      Chesterfield Road, Spring Street, Main Street (Leeds), and Cross Street Paving Project
    • The City has contracted with Palmer Paving for paving and roadway improvements on Chesterfield Road (Westhampton town line to Kennedy Road), Spring Street (Dimock Street to Col. Lavalley Lane; Meadow Street to Pine Street), Main Street - Leeds (Spring Street to 535 feet northerly at the Mill River bridge), and Cross Street (Florence Road to Bliss Street). The scope of this project includes pavement reclamation, cold in-place recycling, line painting, and drainage improvements.  
    • On Spring Street, drainage installation is ongoing and is to continue through the week.
    Bridge Road and Glendale Road Paving Project
    • The City has contracted with Warner Bros for paving on Bridge Road from 100 feet west of Juniper Street to Hatfield Street and Glendale Road from 230 feet south of Westhampton Road to the Easthampton Town line. The overall schedule is May 13 to August 21. Emergency vehicle access and one-way traffic will be maintained. There will be traffic delays. Please seek alternate routes if possible.
    • On Bridge Road, the Contractor will install concrete wheelchair ramps, scored concrete islands, catch basin structures, and prepare the road edge for new asphalt curbing.
    • There is no work scheduled for Glendale Road this week.
    Flood Control System Maintenance Project
    • The City has contracted with Northern Tree Service to perform vegetation removal and maintenance work on portions of the flood control system.
    • Minor work to complete the project will be ongoing throughout the month of July.
    Roberts Meadow Watershed
    • The City contracted with Goodnow Trucking of Winchester, NH for the sale of timber in two white pine stands in Roberts Meadow. This logging operation began in 2018, but was paused due to ground conditions. This project will resume on Monday and continue through early August.
    Damon Road, Bridge Street, Exit 19
    • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June, 2021.
    • Preliminary work includes construction signage installation, survey, work on the northbound I-91 off ramp and utility relocations.
    • Questions about the project should be directed to MassDOT District 2.
    Pavement Markings 
    • The City has contracted with Hi-Way Safety Systems to repaint pavement markings across the City. This includes double yellow center lines, white edge lines, speed hump markings, arrows, railroad markings, and crosswalks. The Contractor will be repainting during night time on 7/14 and 7/15. 


    Friday, July 5, 2019

    Chesterfield Road Closure Planned for July 8 & July 9


    Tree removal work on Chesterfield Road is ongoing. The section of Chesterfield Road between Dimock Street and Reservoir Road will be closed to thru traffic between 8:00am and 4:00pm on Monday, July 8 and Tuesday, July 9. A detour will be in effect. Access will be maintained for emergency vehicles and residents.

    Construction for the week of July 8, Weather Permitting

    Highway Division Update
    •  This week the Highway Division replaced a broken culvert on Hockanum Road, mastic sealed catch basins and manhole covers, graded roadways in the Meadows, and patched potholes on Hockanum Road and Liberty Street.
    • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
    Burts Pit Road Paving Project
    • The City has contracted with Palmer Paving for paving and roadway improvements on Burts Pit Road (Clement Street to Forest Glen Road). Through traffic may be limited to one lane during certain phases of the project; expect delays. The Clement Street Bridge will remain open throughout construction.
    • The first course of pavement is complete. 
    • Final pavement course is scheduled for the week of July 8. 
    • Traffic may be limited to one lane or closed to through traffic, allowing local traffic and emergency vehicles only for certain segments.   
    Chesterfield Road, Spring Street, Main Street (Leeds), and Cross Street Paving Project
    • The City has contracted with Palmer Paving for paving and roadway improvements on Chesterfield Road (Westhampton town line to Kennedy Road), Spring Street (Dimock Street to Col. Lavalley Lane and Meadow Street to Pine Street), Main Street - Leeds (Spring Street to 535 feet northerly at the Mill River bridge), and Cross Street (Florence Road to Bliss Street). The scope of this project includes pavement reclamation, cold in-place recycling, line painting, and drainage improvements.
    • The contractor will be installing drainage on Spring Street starting Tuesday, July 9th.
    • Traffic may be limited to one lane or closed to through traffic, allowing local traffic and emergency vehicles only for certain segments
    Bridge Road and Glendale Road Paving Project
    • The City has contracted with Warner Bros for paving on Bridge Road (100 feet west of Juniper Street to Hatfield Street) and Glendale Road (230 feet south of Westhampton Road to the Easthampton town line). The overall schedule is May 13 to August 21. Emergency vehicle access and one-way traffic will be maintained. There will be traffic delays. Please seek alternate routes if possible.
    • On Bridge Road, the contractor will continue removing existing asphalt curb and excavating driveway aprons.
    • There is no work scheduled for Glendale Road this week.
    Roberts Meadow Watershed
    • The City has contracted with Northeast Tree Care & Landscaping to remove hazard trees adjacent to the following roadways: Chesterfield Road, Kennedy Road, Reservoir Road and Sylvester Road. This work is scheduled for July 1 to July 8. Traffic may be limited to one lane during the work - please expect delays.
    • Between July 8th to July 10th, crews will conduct work along Chesterfield Road between Reservoir Road and Dimock Street, and along Reservoir Road.
    • Chesterfield Road will be closed to through traffic from Reservoir Road to Dimock Street from 7am - 3pm on July 8th and 9th. Access will be maintained for emergency vehicles and residents.
    Pavement Markings
    • The City has contracted with Hi-Way Safety Systems to repaint pavement markings across the City. This includes double yellow center lines, white edge lines, speed hump markings, arrows, railroad markings, and crosswalks. The contractor will be painting during the overnight hours from July 7th through July 11th. 
    Damon Road, Bridge Street, Exit 19
    • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
    • Preliminary work includes construction signage installation, survey, work on the northbound I-91 off ramp and utility relocations.
    • Questions about the project should be directed to MassDOT District 2.

    City of Northampton Implements a Water Use Restriction


    Effective immediately, the City of Northampton Department of Public Works (DPW) is implementing a water use restriction for users of the Northampton Public Water Supply. Limiting water use, especially non-essential outdoor water use, is needed to ensure a sustainable water supply and ​to ​protect stream flow for aquatic life.

    An immediate ban on non-essential outdoor water use is required between the hours of 9:00 AM to 5:00 PM. The water uses banned include:
    • Irrigation of lawns and watering of gardens, flowers, and ornamental plants, except by means of a hand held hose. Irrigation systems may be used from 5:01 PM to 8:59 AM.
    • Washing of vehicles, other than by commercial car wash.
    • Washing of exterior building surfaces, parking lots, driveways or sidewalks, except as needed to apply paint, preservatives, stucco, pavement or cement.
    The City’s water supply system is regulated by the Massachusetts Department of Environmental Protection​​ (DEP). DEP requires that water restrictions be implemented when stream flow in the Mill River drops ​​below 26.3 cubic feet per second for a 3 day period. The water restriction can be lifted when the stream flow rises above that level for 7 consecutive days. The City will notify the public when the water restriction is lifted. Please visit the DPW website at www.northamptonma.gov/dpw for water conservation tips.

    Any person found violating these water restrictions is subject to the fines established in Chapter 325 and Chapter 40 of the City Ordinances. These fines are $100 for the first violation and $200 for the second and subsequent violations.

    Monday, July 1, 2019

    Woodlawn Avenue closure planned for Tuesday, July 2, 7:30am - 3:00pm


    Woodlawn Avenue will be closed to through traffic on Tuesday, July 2, 7:30am - 3:00pm for additional tree work.  Local and emergency access will be maintained.  Please seek alternate routes.

    Friday, June 28, 2019

    Construction work for the week of July 1, Weather Permitting


    Highway Division Update
    • Last week, Public Works repaired potholes on Lovefield Street, North Maple Street, Kimball Street, Howes Street, Fair Street Extension, Elm Street, Locust Street, Parsons Street, Stone Ridge Drive, King Street, Clement Street, Ormond Drive and the Hampton Avenue parking lot.
    • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
    • Roadway islands downtown were maintained.
    Burts Pit Road Paving Project
    • The City has contracted with Palmer Paving for paving and roadway improvements on Burts Pit Road (Clement Street to Forest Glen Road). Through traffic may be limited to one lane during certain phases of the project; expect delays. The Clement Street Bridge will remain open throughout construction.
    • The first course of pavement is complete. 
    • Asphalt curb and driveway work will be conducted during the week of July 1.
    • Final pavement course is scheduled for the week of July 8. 
    • Traffic may be limited to one lane or closed to through traffic, allowing local traffic and emergency vehicles only for certain segments.   
    Chesterfield Road, Spring Street, Main Street (Leeds), and Cross Street Paving Project
    • The City has contracted with Palmer Paving for paving and roadway improvements on Chesterfield Road (Westhampton town line to Kennedy Road), Spring Street (Dimock Street to Col. Lavalley Lane and Meadow Street to Pine Street), Main Street - Leeds (Spring Street to 535 feet northerly at the Mill River bridge), and Cross Street (Florence Road to Bliss Street). The scope of this project includes pavement reclamation, cold in-place recycling, line painting, and drainage improvements.
    • On Spring Street, the contractor will continue to remove curbing this week, and the subcontractor will resume drainage installation on July 8.
    Bridge Road and Glendale Road Paving Project
    • The City has contracted with Warner Bros for paving on Bridge Road (100 feet west of Juniper Street to Hatfield Street) and Glendale Road (230 feet south of Westhampton Road to the Easthampton town line). The overall schedule is May 13 to August 21. Emergency vehicle access and one-way traffic will be maintained. There will be traffic delays. Please seek alternate routes if possible.
    • On Bridge Road, the contractor will continue removing existing asphalt curb and excavating driveway aprons from July 1 to July 3. No work is scheduled for July 4 & 5.
    • There is no work scheduled for Glendale Road this week.
    Flood Control System Maintenance Project
    • The City has contracted with Northern Tree Service to perform vegetation removal and maintenance work on portions of the flood control system.
    • Minor work will be conducted this week on the earthen levees adjacent to Pleasant Street and the Hockanum Road Pumping Station.
    Roberts Meadow Watershed
    • The City has contracted with Northeast Tree Care & Landscaping to remove hazard trees adjacent to the following roadways: Chesterfield Road, Kennedy Road, Reservoir Road and Sylvester Road. This work is scheduled for July 1 to July 8. Traffic may be limited to one lane during the work - please expect delays.
    • Between July 1 to July 3, crews will conduct work along Chesterfield Rd west of Sylvester Rd, Sylvester Rd and Kennedy Rd.
    Damon Road, Bridge Street, Exit 19
    • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
    • Preliminary work includes construction signage installation, survey, work on the northbound I-91 off ramp and utility relocations.
    • Questions about the project should be directed to MassDOT District 2.

    Tuesday, June 25, 2019

    Woodlawn Avenue Closed to Thru Traffic

    Woodlawn Avenue will be closed to through traffic Wednesday, June 26 and Thursday, June 27 for tree work.  Local and emergency access will be maintained.  Please seek alternate routes if possible.

    Friday, June 21, 2019

    Construction Planned for the Week of June 24, 2019 Weather Permitting

    Highway Division Update
    • Last week, Public Works repaired potholes on Crosby Street, Sherman Avenue, Swan Street, Bradford Street, Drury Lane, High Meadow Road, Lyman Street, and the transfer station.
    • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
    • Road Surfacing was done on Hockunum Road and Old Springfield Road.

    Burts Pit Road Paving Project
    • Palmer Paving is continuing work on the paving project for Burts Pit Road from Clement Street to Forest Glen Road. 
    • The first course of pavement is complete. 
    • Adjustments to structures (manholes & catch basins) and work on driveway aprons are scheduled for the week June 24, which will be followed by the asphalt curb placement.
    • Final pavement course is scheduled for the week of July 8. 
    • Traffic may be limited to one lane or closed to through traffic, allowing local traffic and emergency vehicles only for certain segments.   
    • The Clement Street Bridge will remain open throughout construction. Through traffic may be limited to one lane during certain phases of the project; expect delays.

    Chesterfield Road, Spring Street, Main Street (Leeds), and Cross Street Paving Project
    • The City has contracted with Palmer Paving for paving and roadway improvements on Chesterfield Road (Westhampton town line to Kennedy Road), Spring Street (Dimock Street to Col. Lavalley Lane; Meadow Street to Pine Street), Main Street - Leeds (Spring Street to 535 feet northerly at the Mill River bridge), and Cross Street (Florence Road to Bliss Street). The scope of this project includes pavement reclamation, cold in-place recycling, line painting, and drainage improvements.  
    • On Spring Street, the contractor is beginning to remove curb and sidewalk.
    • Drainage installation is anticipated to begin on Spring Street on June 24th and will continue through the week.

    Bridge Road and Glendale Road Paving Project
    • The City has contracted with Warner Bros for paving on Bridge Road from 100 feet west of Juniper Street to Hatfield Street and Glendale Road from 230 feet south of Westhampton Road to the Easthampton Town line. The overall schedule is May 13 to August 21. Emergency vehicle access and one-way traffic will be maintained. There will be traffic delays. Please seek alternate routes if possible.
    • On Bridge Road, the subcontractor will continue to reset structures (i.e. catch basins, manholes, and valve boxes) and begin removal and re-installation of curbs. 
    • There is no work scheduled for Glendale Road this week. 

    Flood Control System Maintenance Project
    • The City has contracted with Northern Tree Service to perform vegetation removal and maintenance work on portions of the flood control system.
    • Minor work will be conducted this week on the earthen levees adjacent to Pleasant Street and the Hockanum Road Pumping Station.

    Damon Road, Bridge Street, Exit 19

    • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June, 2021.
    • Preliminary work includes construction signage installation, survey, work on the northbound I-91 off ramp and utility relocations.
    • Questions about the project should be directed to MassDOT District 2.


    Friday, June 14, 2019

    Construction work for the week of June 17 Weather Permitting

    Highway Division Update

    • Last week, Public Works repaired potholes on Spring Street, Pioneer Knolls, Gilrain Terrace, Brookside Circle, Beattie Drive, Acrebrook Drive, Holly Court, Burts Pit Road Extension, Keyes Street, School Street, Clark Avenue, State Street, Market Street, Crosby Street, City Hall and Memorial Hall Driveways.
    • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.

    Burts Pit Road Paving Project

    • Palmer Paving is continuing work on the paving project for Burts Pit Road from Clement Street to Forest Glen Road. 
    • The first course of pavement is complete. 
    • Adjustments to structures (manholes & catch basins) and work on driveway aprons are scheduled for the week of June 24, which will be followed by asphalt curb placement.
    • Final pavement course is scheduled for the week of July 1. 
    • The Clement Street Bridge will remain open throughout construction. Through traffic may be limited to one lane during certain phases of the project with occasional road section closures. Access for local traffic and emergency vehicles will be maintained. Expect delays.

    Chesterfield Road, Spring Street, Main Street (Leeds), and Cross Street Paving Project

    • The City has contracted with Palmer Paving for paving and roadway improvements on Chesterfield Road (Westhampton town line to Kennedy Road), Spring Street (Dimock Street to Col. Lavalley Lane; Meadow Street to Pine Street), Main Street - Leeds (Spring Street to 535 feet northerly at the Mill River bridge), and Cross Street (Florence Road to Bliss Street). The scope of work includes pavement reclamation, cold in-place recycling, line painting, and drainage improvements.  
    • Preliminary work is ongoing and includes construction sign, erosion control, and tree protection installation.
    • It is anticipated that subdrain installation will begin on Spring Street the week of June 24th.

    Bridge Road and Glendale Road Paving Project

    • The City has contracted with Warner Bros for paving on Bridge Road from 100 feet west of Juniper Street to Hatfield Street and Glendale Road from 230 feet south of Westhampton Road to the Easthampton Town line. The overall schedule is May 13 to August 21. Emergency vehicle access and one-way traffic will be maintained. There will be traffic delays. Please seek alternate routes if possible.
    • On Bridge Road, the subcontractor will continue to reset structures (i.e. catch basins, manholes, and valve boxes) and be removing bituminous curb. Drainage installation is scheduled for Thursday and Friday.
    • No work will occur on Glendale Road this week. 

    Flood Control System Maintenance Project

    • The City has contracted with Northern Tree Service to perform vegetation removal and maintenance work on portions of the flood control system.
    • Minor work will be conducted this week on the earthen levees adjacent to Pleasant Street and the Hockanum Road Pumping Station.

     Damon Road, Bridge Street, Exit 19

    • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June, 2021.
    • Preliminary work includes construction signage installation, survey and work on the northbound I-91 off ramp and utility relocations.
    • Questions about the project should be directed to MassDOT District 2.



    Friday, June 7, 2019

    Construction for the week of June 9, 2019 Weather Permitting


    Highway Division Update
    • Last week, Public Works repaired potholes on Spring Street, Meadow Street, King Street, Strong Avenue, Washington Avenue, Dryads Green, Bright Street, Bright Avenue, Orchard Street, Belmont Avenue, Chapel Street, Ryan Road, and Emily Lane.
    • To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
    • Sewer repairs were done on Bardwell Street and North Maple Street.
    Burts Pit Road Paving Project
    • Palmer Paving is continuing work on the paving project for Burts Pit Road from Clement Street to Forest Glen Road. 
    • The first course of pavement is complete. 
    • Adjustments to structures (manholes & catch basins) and work on driveway aprons are scheduled for the week of June 10, which will be followed by the final pavement course. 
    • The Clement Street Bridge will remain open throughout construction. Through traffic may be limited to one lane during certain phases of the project; expect delays.  
    Damon Road, Bridge Street, Exit 19
    • MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
    • Preliminary work includes construction signage installation, survey and work on the northbound I-91 off ramp, and utility relocations.
    • Questions about the project should be directed to MassDOT District 2.
    Chesterfield Road at Kennedy Road - Upper Roberts Meadow Reservoir Dam
    • SumCo Eco-Contracting, LLC has removed the dam and completed the in-water work. Initial restoration of the staging area is complete and final restoration of the staging area and access roads is in progress and anticipated to be complete by the end of the month. 
    • The project has removed the Upper Roberts Reservoir Dam and restored the Roberts Meadow Brook stream channel to its natural course.
    Chesterfield Road, Spring Street, Main Street (Leeds), and Cross Street Paving Project
    • The City has contracted with Palmer Paving for paving and roadway improvements on Chesterfield Road (Westhampton town line to Kennedy Road), Spring Street (Dimock Street to Col. Lavalley Lane; Meadow Street to Pine Street), Main Street - Leeds (Spring Street to 535 feet northerly at the Mill River bridge), and Cross Street (Florence Road to Bliss Street). The scope of this project includes pavement reclamation, cold in-place recycling, line painting, and drainage improvements.  
    • Preliminary work is ongoing and includes project utility markings and sign installation.
    Bridge Road and Glendale Road Paving Project
    • The City has contracted with Warner Bros for paving on Bridge Road (100 feet west of Juniper Street to Hatfield Street) and Glendale Road (230 feet south of Westhampton Road to the Easthampton town line). The overall schedule is May 13 to August 21. Emergency vehicle access and one-way traffic will be maintained. There will be traffic delays. Please seek alternate routes if possible.
    • On Bridge Road, the contractor will reset structures (i.e. catch basins, manholes, and valve boxes).
    • On Glendale Road, drainage structures and pipes will be installed. 
    Flood Control System Maintenance Project
    • The City has contracted with Northern Tree Service to perform vegetation removal and maintenance work on portions of the flood control system.
    • Work will be conducted this week on the earthen levees adjacent to Pleasant Street and the Hockanum Road Pumping Station.